Go to: ride94news.blogspot.com.

Encryption is key.

Tuesday, September 05, 2006

ADOT Hosts Hearing Sept. 6 For Planned Loop 303

The planned extension of the Loop 303 between Happy Valley Road & I-17 in the north Valley will be the topic of a public hearing in Glendale tomorrow from 6 p.m. – 7:30 p.m. at the Sandra Day O’Connor High School Cafeteria at 25250 N. 35th Ave., in Glendale.

The Arizona Department of Transportation says the hearing provides residents with a chance to learn more about the proposed alignment for the section of the Loop 303 that would connect with I-17 at a new interchange 2 miles south of the Carefree Highway. The planned alignment was developed through environmental studies involving the public & federal, state & local agencies.

A brief presentation will take place at 6:30 p.m. to provide guests with an overview of the environmental study & roadway improvements associated with the northern portion of Loop 303. The proposed extension of Loop 303 would start from the existing Loop 303/Happy Valley Road intersection & travel both north & west to the planned connection with I-17 at Lone Mountain Road.

The Loop 303 is part of a voter-approved 20-year Regional Transportation Plan that went into effect this year. Plans call for construction of the Loop 303 interchange along I-17 to begin near the end of 2007.

 

Sidney Hook

Family Watchdog

Town Of Miami

San Carlos High School

Graham County Chamber

Az Dept. of Health

Casa Grande Union High School District

Coolidge School District

Copper Basin Chamber

Paradise Valley School District

DPS

Superior

Springerville

Tonto Basin Chamber

Rim Country

Apache Times

SW Fire Info

Tonto National Forest

SW Forest Region

BLM Arizona

Recalls.gov

Ray Stevens

O'Reilly Sucks

Visit Metallica.com

Consumption Junction

Motley Crue

X-Play

WWE

King of the Cage